The reconstruction of the of the Cote Saint-Luc City Hall parking lot will soon be underway with a new layout to improve vehicular access and visibility while improving pedestrian safety.

The project includes the reconstruction of the sidewalks, the curbs, the asphalt roadway and parking area, as well as the replacement of the lighting and security cameras.

The main improvements include:

– A new drop-off area at the main rear entrance,
– An elevated section of the roadway and pedestrian crosswalks at the intersection of the
main roadway from Cavendish and the delivery ramp for City Hall,
– A new sidewalk on the south side of City Hall, from Cavendish to the main rear entrance,
– A new central sidewalk median for pedestrians in the main section of the parking lot,
– A new bike path from Cavendish to Sir Walter Scott,
– A double charging station for electric vehicles,
– The addition of approximately 23 parking spaces, (143 spaces compared to the current 120 spaces),
– Replacement of the street lighting and cameras for improved safety.

The work is scheduled to start in July and be completed by mid-October 2017.

Public tenders were opened by the Purchasing Department on June 7, 2017. Six tenders were received ranging in price from $1,941,716.78 to $2,322,010.66 all taxes included. The lowest tender was received from Groupe TNT Inc. is conforming to the tender documents for a total of $1,941,716.78 taxes included.

A previous purchase order was issued for electric vehicle charging stations at the Aquatic and Community Centre and at City Hall. The City Hall EV double charging station will be installed during the reconstruction.

 